Skip to main content
Fig. 16 | Journal of Big Data

Fig. 16

From: The Hiperwall tiled-display wall system for Big-Data research

Fig. 16

a shows a schematic of the flow (top to bottom) of a typical TMVA training application. The TMVA analysis proceeds by consecutively calling the training, testing and performance evaluation methods of the Factory; b shows a schematic of the flow (top to bottom) of a typical TMVA analysis application. The MVA methods qualified by the preceding training and evaluation step are used to classify data of unknown signal and background composition or to predict a regression target [83]

Back to article page